Market:
In 2013, Bellows completed EOG Resources’ three-story, 86,000-sf Building I and structured parking garage. Fast-forward five years and Bellows was back for their expansion. Building II is a mirror image of Building I, is connected by an enclosed walkway, and was constructed on the site where the parking garage, now demolished, once stood. Building II was built to maximize office space and team huddle abilities while Building I contains the conference rooms, cafeteria space, and grand reception area. In addition to Building II, a four-acre, covered parking lot and a Rock Shop / Control Room were built on the same campus.
Subscribe To Our Newsletter
We build more than buildings.
We build relationships.