Location:
Completed: 2001
Architect: Ziegler Cooper Houston, TX
In 2001, Bellows and the design teams from Ziegler Cooper and Merriman Holt Architects completed the 59,000-SF Lower School. Along with classrooms and administrative office space, the new facility is equipped with a new library, cafetorium, playground, art and music rooms, computer labs, and a lecture area.